Dąbrowa Górnicza 2017
In June 2017, we started a project in Dąbrowa Górnicza which consisted of hydraulic heating installations with an pneumatic installation. We did the job with a construction of hanging pipes, assembling boiler rooms, furnaces and insulation at the height of 16-20 meters. With a lot of uneasy to get to areas, making the job uncomfortable, we brought in special equipment and qualified workmen to overcome this issue.